2013 03 Mar 31 10Q
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
(Mark One) |
| | |
ý | | QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the quarterly period ended March 31, 2013
or
|
| | |
¨ | | TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from to
Commission file number 1-442
(Exact name of registrant as specified in its charter)
|
| | |
Delaware | | 91-0425694 |
(State or other jurisdiction of incorporation or organization) | | (I.R.S. Employer Identification No.) |
| | |
100 N. Riverside Plaza, Chicago, IL | | 60606-1596 |
(Address of principal executive offices) | | (Zip Code) |
(Registrant’s telephone number, including area code)
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ý No ¨
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes ý No ¨
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act. (Check one):
|
| | | | |
Large accelerated filer | ý | | Accelerated filer | ¨ |
Non-accelerated filer | ¨ | (Do not check if a smaller reporting company) | Smaller reporting company | ¨ |
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ¨ No ý
As of April 17, 2013, there were 758,681,225 shares of common stock, $5.00 par value, issued and outstanding.
THE BOEING COMPANY
FORM 10-Q
For the Quarter Ended March 31, 2013
INDEX
|
| | |
Part I. Financial Information (Unaudited) | Page |
| | |
Item 1. | | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| |
| | |
Item 2. | | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
Item 3. | | |
| | |
Item 4. | | |
| | |
Part II. Other Information | |
| | |
Item 1. | | |
| | |
Item 1A. | | |
| | |
Item 2. | | |
| | |
Item 3. | | |
| | |
Item 4. | | |
| | |
Item 5. | | |
| | |
Item 6. | | |
| | |
| |
Part I. Financial Information
Item 1. Financial Statements
The Boeing Company and Subsidiaries
Condensed Consolidated Statements of Operations
(Unaudited)
|
| | | | | | | |
(Dollars in millions, except per share data) | Three months ended March 31 |
| 2013 |
| | 2012 |
|
Sales of products |
| $16,318 |
| |
| $16,685 |
|
Sales of services | 2,575 |
| | 2,698 |
|
Total revenues | 18,893 |
| | 19,383 |
|
|
|
| |
|
|
Cost of products | (13,728 | ) | | (13,661 | ) |
Cost of services | (2,009 | ) | | (2,380 | ) |
Boeing Capital interest expense | (19 | ) | | (33 | ) |
Total costs and expenses | (15,756 | ) | | (16,074 | ) |
| 3,137 |
| | 3,309 |
|
Income from operating investments, net | 45 |
| | 46 |
|
General and administrative expense | (971 | ) | | (955 | ) |
Research and development expense, net | (705 | ) | | (835 | ) |
Gain on dispositions, net | 22 |
| |
|
|
Earnings from operations | 1,528 |
| | 1,565 |
|
Other income, net | 9 |
| | 12 |
|
Interest and debt expense | (99 | ) | | (114 | ) |
Earnings before income taxes | 1,438 |
| | 1,463 |
|
Income tax expense | (332 | ) | | (539 | ) |
Net earnings from continuing operations | 1,106 |
| | 924 |
|
Net loss on disposal of discontinued operations, net of taxes of $0 and $1 |
|
| | (1 | ) |
Net earnings |
| $1,106 |
|
|
| $923 |
|
Basic earnings per share from continuing operations |
| $1.45 |
| |
| $1.23 |
|
Net loss on disposal of discontinued operations, net of taxes |
| |
|
Basic earnings per share |
| $1.45 |
| |
| $1.23 |
|
Diluted earnings per share from continuing operations |
| $1.44 |
| |
| $1.22 |
|
Net loss on disposal of discontinued operations, net of taxes |
| |
|
Diluted earnings per share |
| $1.44 |
| |
| $1.22 |
|
Cash dividends paid per share |
| $0.49 |
| |
| $0.44 |
|
Weighted average diluted shares (millions) | 768.7 |
| | 759.6 |
|
See Notes to the Condensed Consolidated Financial Statements.
The Boeing Company and Subsidiaries
Condensed Consolidated Statements of Comprehensive Income
(Unaudited)
|
| | | | | | | |
(Dollars in millions) | Three months ended March 31 |
| 2013 |
| | 2012 |
|
Net earnings |
| $1,106 |
| |
| $923 |
|
Other comprehensive income, net of tax: | | | |
Currency translation adjustments | (23 | ) | | 45 |
|
Unrealized (loss)/gain on derivative instruments: | | | |
Unrealized (loss)/gain arising during period, net of tax of $15 and ($11) | (26 | ) | | 18 |
|
Reclassification adjustment for loss included in net earnings, net of tax of ($1) and $0 | 2 |
| |
|
Total unrealized (loss)/gain on derivative instruments, net of tax | (24 | ) | | 18 |
|
Defined benefit pension plans & other postretirement benefits: | | | |
Amortization of prior service cost included in net periodic pension cost, net of tax of ($1) and ($3) | 3 |
| | 4 |
|
Net actuarial gain arising during the period, net of tax of ($16) and ($9) | 30 |
| | 16 |
|
Amortization of actuarial losses included in net periodic pension cost, net of tax of ($215) and ($188) | 378 |
| | 326 |
|
Settlements and curtailments included in net income, net of tax of ($5) and ($2) | 9 |
| | 3 |
|
Pension and post retirement benefits related to our equity method investments, net of tax ($1) and $4 | 2 |
| | (6 | ) |
Total defined benefit pension plans & other postretirement benefits, net of tax | 422 |
| | 343 |
|
Other comprehensive income, net of tax | 375 |
| | 406 |
|
Comprehensive income related to noncontrolling interest | 2 |
| |
|
Comprehensive income, net of tax |
| $1,483 |
| |
| $1,329 |
|
See Notes to the Condensed Consolidated Financial Statements.
The Boeing Company and Subsidiaries
Condensed Consolidated Statements of Financial Position
(Unaudited)
|
| | | | | | | |
(Dollars in millions, except per share data) | March 31 2013 |
| | December 31 2012 |
|
Assets | | | |
Cash and cash equivalents |
| $8,335 |
| |
| $10,341 |
|
Short-term and other investments | 3,518 |
| | 3,217 |
|
Accounts receivable, net | 6,351 |
| | 5,608 |
|
Current portion of customer financing, net | 460 |
| | 364 |
|
Deferred income taxes | 29 |
| | 28 |
|
Inventories, net of advances and progress billings | 40,797 |
| | 37,751 |
|
Total current assets | 59,490 |
| | 57,309 |
|
Customer financing, net | 3,910 |
| | 4,056 |
|
Property, plant and equipment, net of accumulated depreciation of $14,711 and $14,645 | 9,736 |
| | 9,660 |
|
Goodwill | 5,049 |
| | 5,035 |
|
Acquired intangible assets, net | 3,075 |
| | 3,111 |
|
Deferred income taxes | 6,522 |
| | 6,753 |
|
Investments | 1,177 |
| | 1,180 |
|
Other assets, net of accumulated amortization of $539 and $504 | 1,488 |
| | 1,792 |
|
Total assets |
| $90,447 |
| |
| $88,896 |
|
Liabilities and equity | | | |
Accounts payable |
| $9,876 |
| |
| $9,394 |
|
Accrued liabilities | 11,530 |
| | 12,995 |
|
Advances and billings in excess of related costs | 18,505 |
| | 16,672 |
|
Deferred income taxes and income taxes payable | 4,838 |
| | 4,485 |
|
Short-term debt and current portion of long-term debt | 917 |
| | 1,436 |
|
Total current liabilities | 45,666 |
| | 44,982 |
|
Accrued retiree health care | 7,447 |
| | 7,528 |
|
Accrued pension plan liability, net | 19,878 |
| | 19,651 |
|
Non-current income taxes payable | 241 |
| | 366 |
|
Other long-term liabilities | 1,401 |
| | 1,429 |
|
Long-term debt | 8,254 |
| | 8,973 |
|
Shareholders’ equity: | | | |
Common stock, par value $5.00 – 1,200,000,000 shares authorized; 1,012,261,159 shares issued | 5,061 |
| | 5,061 |
|
Additional paid-in capital | 4,079 |
| | 4,122 |
|
Treasury stock, at cost - 253,939,815 and 256,630,628 | (15,780 | ) | | (15,937 | ) |
Retained earnings | 31,143 |
| | 30,037 |
|
Accumulated other comprehensive loss | (17,041 | ) | | (17,416 | ) |
Total shareholders’ equity | 7,462 |
| | 5,867 |
|
Noncontrolling interest | 98 |
| | 100 |
|
Total equity | 7,560 |
| | 5,967 |
|
Total liabilities and equity |
| $90,447 |
| |
| $88,896 |
|
See Notes to the Condensed Consolidated Financial Statements.
The Boeing Company and Subsidiaries
Condensed Consolidated Statements of Cash Flows
(Unaudited)
|
| | | | | | | |
(Dollars in millions) | Three months ended March 31 |
| 2013 |
|
| 2012 |
|
Cash flows – operating activities: | |
| |
Net earnings |
| $1,106 |
|
|
| $923 |
|
Adjustments to reconcile net earnings to net cash provided by operating activities: | |
| |
Non-cash items – | |
| |
Share-based plans expense | 58 |
|
| 50 |
|
Depreciation and amortization | 429 |
|
| 426 |
|
Investment/asset impairment charges, net | 26 |
|
| 36 |
|
Customer financing valuation benefit | (3 | ) |
|
|
|
Loss on disposal of discontinued operations |
|
| | 2 |
|
Gain on dispositions, net | (22 | ) | |
|
|
Other charges and credits, net | 53 |
|
| 150 |
|
Excess tax benefits from share-based payment arrangements | (23 | ) |
| (40 | ) |
Changes in assets and liabilities – | |
| |
Accounts receivable | (437 | ) |
| (729 | ) |
Inventories, net of advances and progress billings | (3,000 | ) |
| (497 | ) |
Accounts payable | 654 |
|
| 506 |
|
Accrued liabilities | (1,133 | ) |
| (1,032 | ) |
Advances and billings in excess of related costs | 1,833 |
|
| (160 | ) |
Income taxes receivable, payable and deferred | 214 |
|
| 333 |
|
Other long-term liabilities | (73 | ) |
| (45 | ) |
Pension and other postretirement plans | 821 |
|
| 724 |
|
Customer financing, net | 24 |
|
| 196 |
|
Other | (3 | ) |
| (6 | ) |
Net cash provided by operating activities | 524 |
|
| 837 |
|
Cash flows – investing activities: | | | |
Property, plant and equipment additions | (521 | ) | | (424 | ) |
Property, plant and equipment reductions | 33 |
| | 4 |
|
Acquisitions, net of cash acquired | (26 | ) | |
|
|
Contributions to investments | (2,955 | ) | | (3,718 | ) |
Proceeds from investments | 2,655 |
| | 1,135 |
|
Net cash used by investing activities | (814 | ) | | (3,003 | ) |
Cash flows – financing activities: | | | |
New borrowings | 15 |
| | 20 |
|
Debt repayments | (1,262 | ) | | (811 | ) |
Repayments of distribution rights financing | (138 | ) | | (72 | ) |
Stock options exercised, other | 76 |
| | 28 |
|
Excess tax benefits from share-based payment arrangements | 23 |
| | 40 |
|
Employee taxes on certain share-based payment arrangements | (52 | ) | | (64 | ) |
Dividends paid | (367 | ) | | (328 | ) |
Net cash used by financing activities | (1,705 | ) | | (1,187 | ) |
Effect of exchange rate changes on cash and cash equivalents | (11 | ) | | 22 |
|
Net decrease in cash and cash equivalents | (2,006 | ) | | (3,331 | ) |
Cash and cash equivalents at beginning of year | 10,341 |
| | 10,049 |
|
Cash and cash equivalents at end of period |
| $8,335 |
| |
| $6,718 |
|
See Notes to the Condensed Consolidated Financial Statements.
The Boeing Company and Subsidiaries
Condensed Consolidated Statements of Equity
(Unaudited)
|
| | | | | | | | | | | | | | | | | | | | | |
| Boeing shareholders | | |
(Dollars in millions, except per share data) | Common Stock |
| Additional Paid-In Capital |
| Treasury Stock |
| Retained Earnings |
| Accumulated Other Comprehensive Loss |
| Non- controlling Interest |
| Total |
|
Balance January 1, 2012 |
| $5,061 |
|
| $4,033 |
|
| ($16,603 | ) |
| $27,524 |
|
| ($16,500 | ) |
| $93 |
|
| $3,608 |
|
Net earnings | | | | 923 |
| |
|
| 923 |
|
Other comprehensive income, net of tax of ($209) | | | | | 406 |
| | 406 |
|
Share-based compensation and related dividend equivalents | | 50 |
| |
|
| | | 50 |
|
Excess tax pools | | 40 |
| | | | | 40 |
|
Treasury shares issued for stock options exercised, net | | (11 | ) | 40 |
| | | | 29 |
|
Treasury shares issued for other share-based plans, net | | (156 | ) | 98 |
| | | | (58 | ) |
Treasury shares issued for 401(k) contribution | | 21 |
| 101 |
| | | | 122 |
|
Balance March 31, 2012 |
| $5,061 |
|
| $3,977 |
|
| ($16,364 | ) |
| $28,447 |
|
| ($16,094 | ) |
| $93 |
|
| $5,120 |
|
| | | | | | | |
Balance January 1, 2013 |
| $5,061 |
|
| $4,122 |
|
| ($15,937 | ) |
| $30,037 |
|
| ($17,416 | ) |
| $100 |
|
| $5,967 |
|
Net earnings | | | | 1,106 |
| | 2 |
| 1,108 |
|
Other comprehensive income, net of tax of ($224) | | | | | 375 |
| | 375 |
|
Share-based compensation and related dividend equivalents | | 58 |
| |
|
| | | 58 |
|
Excess tax pools | | 17 |
| | | | | 17 |
|
Treasury shares issued for stock options exercised, net | | (4 | ) | 85 |
| | | | 81 |
|
Treasury shares issued for other share-based plans, net | | (114 | ) | 72 |
| | | | (42 | ) |
Changes in noncontrolling interest | | | | | | (4 | ) | (4 | ) |
Balance March 31, 2013 |
| $5,061 |
|
| $4,079 |
|
| ($15,780 | ) |
| $31,143 |
|
| ($17,041 | ) |
| $98 |
|
| $7,560 |
|
See Notes to the Condensed Consolidated Financial Statements.
The Boeing Company and Subsidiaries
Notes to Condensed Consolidated Financial Statements
Summary of Business Segment Data
(Unaudited)
|
| | | | | | | |
(Dollars in millions) | Three months ended March 31 |
| 2013 |
| | 2012 |
|
Revenues: |
| |
|
Commercial Airplanes |
| $10,690 |
| |
| $10,937 |
|
Defense, Space & Security: |
| |
|
Boeing Military Aircraft | 4,109 |
| | 4,222 |
|
Network & Space Systems | 1,960 |
| | 1,872 |
|
Global Services & Support | 2,041 |
| | 2,139 |
|
Total Defense, Space & Security | 8,110 |
| | 8,233 |
|
Boeing Capital | 105 |
| | 125 |
|
Other segment | 27 |
| | 24 |
|
Unallocated items and eliminations | (39 | ) | | 64 |
|
Total revenues |
| $18,893 |
| |
| $19,383 |
|
Earnings from operations: |
| |
|
Commercial Airplanes |
| $1,219 |
| |
| $1,081 |
|
Defense, Space & Security: |
| |
|
Boeing Military Aircraft | 430 |
| | 399 |
|
Network & Space Systems | 156 |
| | 109 |
|
Global Services & Support | 246 |
| | 234 |
|
Total Defense, Space & Security | 832 |
| | 742 |
|
Boeing Capital | 44 |
| | 33 |
|
Other segment | (58 | ) |
| (79 | ) |
Unallocated items and eliminations | (509 | ) |
| (212 | ) |
Earnings from operations | 1,528 |
| | 1,565 |
|
Other income, net | 9 |
| | 12 |
|
Interest and debt expense | (99 | ) | | (114 | ) |
Earnings before income taxes | 1,438 |
| | 1,463 |
|
Income tax expense | (332 | ) | | (539 | ) |
Net earnings from continuing operations | 1,106 |
| | 924 |
|
Net loss on disposal of discontinued operations, net of taxes of $0 and $1 |
|
| | (1 | ) |
Net earnings |
| $1,106 |
| |
| $923 |
|
This information is an integral part of the Notes to the Condensed Consolidated Financial Statements. See Note 17 for further segment results.
The Boeing Company and Subsidiaries
Notes to the Condensed Consolidated Financial Statements
(Dollars in millions, except per share data)
(Unaudited)
Note 1 – Basis of Presentation
The condensed consolidated interim financial statements included in this report have been prepared by management of The Boeing Company (herein referred to as “Boeing”, the “Company”, “we”, “us”, or “our”). In the opinion of management, all adjustments (consisting of normal recurring accruals) necessary for a fair presentation are reflected in the interim financial statements. The results of operations for the period ended March 31, 2013 are not necessarily indicative of the operating results for the full year. The interim financial statements should be read in conjunction with the audited Consolidated Financial Statements, including the notes thereto, included in our 2012 Annual Report on Form 10-K. Amounts reported in prior periods as Interest and debt expense have been reclassified to Boeing Capital Interest expense to conform to the current period's presentation.
Use of Estimates
Management makes assumptions and estimates to prepare financial statements in conformity with accounting principles generally accepted in the United States of America. Those assumptions and estimates directly affect the amounts reported in the Condensed Consolidated Financial Statements. Significant estimates for which changes in the near term are considered reasonably possible and that may have a material impact on the financial statements are disclosed in these Notes to the Condensed Consolidated Financial Statements.
Contract accounting is used for development and production activities predominantly by Defense, Space & Security (BDS). Contract accounting involves a judgmental process of estimating total sales and costs for each contract resulting in the development of estimated cost of sales percentages. Changes in estimated revenues, cost of sales and the related effect on operating income are recognized using a cumulative catch-up adjustment which recognizes in the current period the cumulative effect of the changes on current and prior periods based on a contract’s percent complete. For the three months ended March 31, 2013 and 2012, net favorable cumulative catch-up adjustments, including reach-forward losses, across all BDS contracts increased Earnings from operations by $105 and $112 and diluted earnings per share by $0.11 and $0.09.
Note 2 – Earnings Per Share
Basic and diluted earnings per share are computed using the two-class method, which is an earnings allocation method that determines earnings per share for common shares and participating securities. The undistributed earnings are allocated between common shares and participating securities as if all earnings had been distributed during the period. Participating securities and common shares have equal rights to undistributed earnings.
Basic earnings per share is calculated by taking net earnings, less earnings available to participating securities, divided by the basic weighted average common shares outstanding.
Diluted earnings per share is calculated by taking net earnings, less earnings available to participating securities, divided by the diluted weighted average common shares outstanding.
The elements used in the computation of basic and diluted earnings per share were as follows:
|
| | | | | | | |
(In millions - except per share amounts) | Three months ended March 31 |
| 2013 |
| | 2012 |
|
Net earnings |
| $1,106 |
| |
| $923 |
|
Less: earnings available to participating securities | 3 |
| | 3 |
|
Net earnings available to common shareholders |
| $1,103 |
| |
| $920 |
|
Basic | | | |
Basic weighted average shares outstanding | 763.3 |
| | 752.5 |
|
Less: participating securities | 2.1 |
| | 2.3 |
|
Basic weighted average common shares outstanding | 761.2 |
| | 750.2 |
|
Diluted | | | |
Basic weighted average shares outstanding | 763.3 |
| | 752.5 |
|
Dilutive potential common shares(1) | 5.4 |
| | 7.1 |
|
Diluted weighted average shares outstanding | 768.7 |
| | 759.6 |
|
Less: participating securities | 2.1 |
| | 2.3 |
|
Diluted weighted average common shares outstanding | 766.6 |
| | 757.3 |
|
Net earnings per share: | | | |
Basic |
| $1.45 |
| |
| $1.23 |
|
Diluted | 1.44 |
| | 1.22 |
|
| |
(1) | Diluted EPS includes any dilutive impact of stock options, restricted stock units and Performance Awards. |
The shares included in the following table were not included in the computation of diluted earnings per share because the effect was antidilutive. However, these shares may be dilutive potential common shares in the future.
|
| | | | | |
(Shares in millions) | Three months ended March 31 |
| 2013 |
| | 2012 |
|
Stock options | 19.1 |
| | 18.5 |
|
Performance Awards | 5.8 |
| | 4.5 |
|
Note 3 – Income Taxes
Our effective income tax rates were 23.1% and 36.8% for the three months ended March 31, 2013 and 2012. The effective tax rate for the first quarter of 2013 is lower than the comparable prior year period primarily due to the inclusion of U.S. research and development tax credits in 2013 which were not available in 2012. On January 2, 2013, President Obama signed into law the American Taxpayer Relief Act of 2012 that retroactively renewed the research and development tax credit for 2012 and extended the credit through December 31, 2013. As tax law changes are recognized in the period in which new legislation is enacted, the 2012 R&D credit of $145 is reflected as a discrete item in our income tax rate for the first quarter of 2013.
Federal income tax audits have been settled for all years prior to 2007. The years 2009-2010 are currently being examined by the IRS, and we have filed appeals with the IRS for tax years 2007-2008. We are also subject to examination in major state and international jurisdictions for the 2001-2012 tax years. We believe appropriate provisions for all outstanding tax issues have been made for all jurisdictions and all open years.
Audit outcomes and the timing of audit settlements are subject to significant uncertainty. It is reasonably possible that within the next 12 months we will resolve the matters presently under consideration for the
2007-2008 tax years with the IRS. Depending on the timing and outcome of the audit settlement, unrecognized tax benefits that affect the effective tax rate could increase earnings by up to $250 based on current estimates.
Note 4 – Accounts Receivable
Accounts receivable as of March 31, 2013, includes $112 of unbillable receivables on a long-term contract with LightSquared, LLC (LightSquared) related to the construction of two commercial satellites. One of the satellites has been delivered, and the other is substantially complete but remains in Boeing’s possession. On May 14, 2012, LightSquared filed for Chapter 11 bankruptcy protection. We believe that our rights in the second satellite and related ground-segment assets are sufficient to protect the value of our receivables in the event LightSquared fails to make payments as contractually required or rejects its contract with us. Given the uncertainties inherent in bankruptcy proceedings it is reasonably possible that we could incur losses related to these receivables in connection with the LightSquared bankruptcy.
Note 5 – Inventories
Inventories consisted of the following:
|
| | | | | | | |
| March 31 2013 |
| | December 31 2012 |
|
Long-term contracts in progress |
| $15,246 |
| |
| $15,130 |
|
Commercial aircraft programs | 44,340 |
| | 40,389 |
|
Commercial spare parts, used aircraft, general stock materials and other | 7,042 |
| | 7,206 |
|
Inventory before advances and progress billings | 66,628 |
| | 62,725 |
|
Less advances and progress billings | (25,831 | ) | | (24,974 | ) |
Total |
| $40,797 |
| |
| $37,751 |
|
Long-Term Contracts in Progress
Long-term contracts in progress included Delta launch program inventory that is being sold at cost to United Launch Alliance (ULA) under an inventory supply agreement that terminates on March 31, 2021. At March 31, 2013 and December 31, 2012, the inventory balance, net of advances, was $725. At March 31, 2013, $440 of this inventory related to unsold launches. See Note 10.
Inventory balances included $237 subject to claims or other uncertainties relating to the A-12 program at March 31, 2013 and December 31, 2012. See Note 16.
Capitalized precontract costs of $261 and $238 at March 31, 2013 and December 31, 2012, are included in inventories.
Commercial Aircraft Programs
At March 31, 2013 and December 31, 2012, commercial aircraft programs inventory included the following amounts related to the 787 program: $24,358 and $21,289 of work in process (including deferred production costs of $17,095 and $15,929), $1,947 and $1,908 of supplier advances, and $2,508 and $2,339 of unamortized tooling and other non-recurring costs. At March 31, 2013, $14,525 of 787 deferred production costs, unamortized tooling and other non-recurring costs are expected to be recovered from units included in the program accounting quantity that have firm orders and $5,078 is expected to be recovered from units included in the program accounting quantity that represent expected future orders.
At March 31, 2013 and December 31, 2012, commercial aircraft programs inventory included the following amounts related to the 747 program: $1,312 and $1,292 of deferred production costs, net of previously recorded reach-forward losses, and $653 and $683 of unamortized tooling costs. At March 31, 2013, $1,046 of 747 deferred production costs and unamortized tooling are expected to be recovered from units included
in the program accounting quantity that have firm orders and $919 is expected to be recovered from units included in the program accounting quantity that represent expected future orders.
Commercial aircraft programs inventory included amounts credited in cash or other consideration (early issue sales consideration) to airline customers totaling $3,083 and $2,989 at March 31, 2013 and December 31, 2012.
Note 6 – Customer Financing
Customer financing primarily relates to the BCC segment and consisted of the following:
|
| | | | | | | |
| March 31 2013 |
| | December 31 2012 |
|
Financing receivables: | | | |
Investment in sales-type/finance leases |
| $1,802 |
| |
| $1,850 |
|
Notes | 668 |
| | 592 |
|
Operating lease equipment, at cost, less accumulated depreciation of $550 and $628 | 1,956 |
| | 2,038 |
|
Gross customer financing | 4,426 |
| | 4,480 |
|
Less allowance for losses on receivables | (56 | ) | | (60 | ) |
Total |
| $4,370 |
| |
| $4,420 |
|
We determine a receivable is impaired when, based on current information and events, it is probable that we will be unable to collect amounts due according to the original contractual terms. At March 31, 2013 and December 31, 2012, we individually evaluated for impairment customer financing receivables of $596 and $616 and determined that $444 and $446 were impaired. We recorded no allowance for losses on these impaired receivables as the collateral values exceed the carrying values of the receivables.
The adequacy of the allowance for losses is assessed quarterly. Three primary factors influencing the level of our allowance for losses on customer financing receivables are customer credit ratings, default rates and collateral values. We assign internal credit ratings for all customers and determine the creditworthiness of each customer based upon publicly available information and information obtained directly from our customers. Our rating categories are comparable to those used by the major credit rating agencies.
Our financing receivable balances by internal credit rating category are shown below.
|
| | | | | | | |
Rating categories | March 31 2013 |
| | December 31 2012 |
|
BBB |
| $1,165 |
| |
| $1,201 |
|
BB | 55 |
| | 63 |
|
B | 152 |
| | 51 |
|
CCC | 502 |
| | 511 |
|
D | 504 |
| | 524 |
|
Other | 92 |
| | 92 |
|
Total carrying value of financing receivables |
| $2,470 |
| |
| $2,442 |
|
At March 31, 2013, our allowance primarily related to receivables with ratings of CCC and we applied default rates that averaged 46% to the exposure associated with those receivables.
In the fourth quarter of 2011, American Airlines Inc. (American Airlines) filed for Chapter 11 bankruptcy protection. We believe that our customer financing receivables from American Airlines of $504 are sufficiently collateralized such that we do not expect to incur losses related to those receivables and have not recorded an allowance for losses as of March 31, 2013 as a result of the bankruptcy.
Customer Financing Exposure Customer financing is collateralized by security in the related asset. The value of the collateral is closely tied to commercial airline performance and may be subject to reduced valuation with market decline. Declines in collateral values are also a significant driver of our allowance for losses. Generally, out-of-production aircraft have experienced greater collateral value declines than in-production aircraft. Our customer financing portfolio consists primarily of financing receivables for out-of-production aircraft. The value of the collateral is closely tied to commercial airline performance and overall market conditions. The majority of customer financing carrying values are concentrated in the following aircraft models:
|
| | | | | | | |
| March 31 2013 |
| | December 31 2012 |
|
717 Aircraft ($460 and $465 accounted for as operating leases) (1) |
| $1,755 |
| |
| $1,781 |
|
757 Aircraft ($422 and $454 accounted for as operating leases) (1) | 506 |
| | 561 |
|
MD-80 Aircraft (Accounted for as sales-type finance leases) (1) | 444 |
| | 446 |
|
747 Aircraft ($246 and $221 accounted for as operating leases) | 351 |
| | 221 |
|
737 Aircraft ($170 and $193 accounted for as operating leases) | 289 |
| | 316 |
|
787 Aircraft (Accounted for as operating leases) | 282 |
| | 286 |
|
MD-11 Aircraft (Accounted for as operating leases) (1) | 265 |
| | 269 |
|
767 Aircraft ($63 and $63 accounted for as operating leases) | 207 |
| | 223 |
|
| |
(1) | Out-of-production aircraft. |
Note 7 – Investments
Our investments, which are recorded in Short-term and other investments or Investments, consisted of the following:
|
| | | | | | | |
| March 31 2013 |
| | December 31 2012 |
|
Time deposits |
| $3,445 |
| |
| $3,135 |
|
Pledged money market funds (1) | 46 |
| | 56 |
|
Available-for-sale investments | 9 |
| | 9 |
|
Equity method investments (2) | 1,135 |
| | 1,137 |
|
Restricted cash (3) | 25 |
| | 25 |
|
Other investments | 35 |
| | 35 |
|
Total |
| $4,695 |
| |
| $4,397 |
|
| |
(1) | Reflects amounts pledged in lieu of letters of credit as collateral in support of our workers’ compensation programs. These funds can become available within 30 days notice upon issuance of replacement letters of credit. |
| |
(2) | Dividends received were $50 and $53 during the three months ended March 31, 2013 and 2012. |
| |
(3) | Restricted to pay life insurance premiums for certain employees and certain claims related to workers' compensation. |
Note 8 – Other Assets
Sea Launch
At March 31, 2013 and December 31, 2012, Other assets included $356 of receivables related to our former investment in the Sea Launch venture which became payable by certain Sea Launch partners following Sea Launch’s bankruptcy filing in June 2009. The $356 includes $147 related to a payment made by us under a bank guarantee on behalf of Sea Launch and $209 related to loans (partner loans) we made to Sea Launch. The net amounts owed to Boeing by each of the partners are as follows: S.P. Koroley Rocket and Space
Corporation Energia of Russia – $223, PO Yuzhnoye Mashinostroitelny Zavod of Ukraine – $89 and KB Yuzhnoye of Ukraine – $44.
Although each partner is contractually obligated to reimburse us for its share of the bank guarantee, the Russian and Ukrainian partners have raised defenses to enforcement and contested our claims. On October 19, 2009, we filed a Notice of Arbitration with the Stockholm Chamber of Commerce seeking reimbursement from the other Sea Launch partners of the $147 bank guarantee payment. On October 7, 2010, the arbitrator ruled that the Stockholm Chamber of Commerce lacked jurisdiction to hear the matter but did not resolve the merits of our claim. We filed a notice appealing the arbitrator’s ruling on January 11, 2011. The Ukrainian partners responded to our appeal on June 30, 2012 and the Russian partner responded on July 3, 2012. We filed replies on September 20, 2012. On February 1, 2013, we filed an action in the United States District Court for the Central District of California seeking reimbursement from the other Sea Launch partners of the $147 bank guarantee payment and the $209 partner loan obligations. We believe the partners have the financial wherewithal to pay and intend to pursue vigorously all of our rights and remedies. In the event we are unable to secure reimbursement of $147 related to our payment under the bank guarantee and $209 related to partner loans made to Sea Launch, we could incur additional pre-tax charges of up to $356.
Note 9 – Commitments and Contingencies
Environmental
The following table summarizes environmental remediation activity during the three months ended March 31, 2013 and 2012.
|
| | | | | | | |
| 2013 |
| | 2012 |
|
Beginning balance – January 1 |
| $710 |
| |
| $758 |
|
Reductions for payments made | (8 | ) | | (12 | ) |
Changes in estimates | 5 |
| | 12 |
|
Ending balance - March 31 |
| $707 |
| |
| $758 |
|
The liabilities recorded represent our best estimate or the low end of a range of reasonably possible costs expected to be incurred to remediate sites, including operation and maintenance over periods of up to 30 years. It is reasonably possible that we may incur charges that exceed these recorded amounts because of regulatory agency orders and directives, changes in laws and/or regulations, higher than expected costs and/or the discovery of new or additional contamination. As part of our estimating process, we develop a range of reasonably possible alternate scenarios which include the high end of a range of reasonably possible cost estimates for all remediation sites for which we have sufficient information based on our experience and existing laws and regulations. There are some potential remediation obligations where the costs of remediation cannot be reasonably estimated. At March 31, 2013 and December 31, 2012, the high end of the estimated range of reasonably possible remediation costs exceeded our recorded liabilities by $857 and $865.
Product Warranties
The following table summarizes product warranty activity recorded during the three months ended March 31, 2013 and 2012.
|
| | | | | | | |
| 2013 |
| | 2012 |
|
Beginning balance – January 1 |
| $1,572 |
| |
| $1,046 |
|
Additions for current year deliveries | 63 |
| | 109 |
|
Reductions for payments made | (129 | ) | | (66 | ) |
Changes in estimates | 1 |
| | (6 | ) |
Ending balance - March 31 |
| $1,507 |
| |
| $1,083 |
|
Commercial Aircraft Commitments
In conjunction with signing definitive agreements for the sale of new aircraft (Sale Aircraft), we have entered into trade-in commitments with certain customers that give them the right to trade in used aircraft at a specified price upon the purchase of Sale Aircraft. The probability that trade-in commitments will be exercised is determined by using both quantitative information from valuation sources and qualitative information from other sources. The probability of exercise is assessed quarterly, or as events trigger a change, and takes into consideration the current economic and airline industry environments. Trade-in commitments, which can be terminated by mutual consent with the customer, may be exercised only during the period specified in the agreement, and require advance notice by the customer.
Trade-in commitment agreements at March 31, 2013 have expiration dates from 2013 through 2023. At March 31, 2013, and December 31, 2012 total contractual trade-in commitments were $1,620 and $1,535. As of March 31, 2013 and December 31, 2012, we estimated that it was probable we would be obligated to perform on certain of these commitments with net amounts payable to customers totaling $173 and $108 and the fair value of the related trade-in aircraft was $173 and $108.
Financing Commitments
Financing commitments related to aircraft on order, including options and those proposed in sales campaigns, totaled $17,714 and $18,083 as of March 31, 2013 and December 31, 2012. The estimated earliest potential funding dates for these commitments as of March 31, 2013 are as follows:
|
| | | |
| Total |
|
April through December 2013 |
| $935 |
|
2014 | 2,841 |
|
2015 | 3,977 |
|
2016 | 3,283 |
|
2017 | 3,064 |
|
Thereafter | 3,614 |
|
|
| $17,714 |
|
As of March 31, 2013, $16,640 of these financing commitments related to customers we believe have less than investment-grade credit. We have concluded that no reserve for future potential losses is required for these financing commitments based upon the terms, such as collateralization and interest rates, under which funding would be provided.
Standby Letters of Credit and Surety Bonds
We have entered into standby letters of credit and surety bonds with financial institutions primarily relating to the guarantee of our future performance on certain contracts. Contingent liabilities on outstanding letters of credit agreements and surety bonds aggregated approximately $4,443 and $4,545 as of March 31, 2013 and December 31, 2012.
Commitments to ULA
We and Lockheed Martin Corporation have each committed to provide ULA with up to $527 of additional capital contributions in the event ULA does not have sufficient funds to make a required payment to us under an inventory supply agreement. See Note 5.
C-17
At March 31, 2013, our backlog included 3 C-17 aircraft under contract with the U.S. Air Force (USAF) and an international order for 9 C-17 aircraft. We are currently producing C-17 aircraft at a rate of 10 per year. Should additional orders not materialize, it is reasonably possible that we will decide in 2013 to end production
of the C-17 at a future date. We are still evaluating the full financial impact of a potential production shutdown, including pension curtailment charges, and any recovery that would be available from the U.S. government. Such recovery from the U.S. government would not include the costs incurred by us resulting from our direction to suppliers to begin working on aircraft beyond those currently under contract. At March 31, 2013, we had approximately $410 of inventory expenditures and potential termination liabilities to suppliers associated with 12 aircraft for international customers not currently under contract.
U.S. Government Defense Budget/Sequestration
In August 2011, the Budget Control Act (The Act) reduced the United States defense top line budget by approximately $490 billion through 2021. The Act further reduced the defense top line budget by an additional $500 billion through 2021 if Congress did not enact $1.2 trillion in further budget reductions by January 15, 2012. Should Congress in future years provide funding above the yearly spending limits of The Act, sequestration will automatically take effect and cancel any excess amount above the limits. The annual spending limits of The Act will remain in place until current law is changed.
On March 1, 2013, sequestration was implemented for the U.S. government fiscal year 2013 (FY2013), canceling $42.7 billion of planned U.S. defense budgetary spending. The Office of Management and Budget (OMB) subsequently issued a report to Congress listing illustrative cuts which equal a 7.8% reduction in FY2013 non-exempt defense discretionary funding and a 5.0% reduction in non-exempt nondefense discretionary funding. However, as noted in the OMB report, the effective reduction in funds would be approximately 13% for non-exempt defense programs and 9% for non-exempt nondefense programs if implemented over the seven-month period from March 1, 2013 to September 30, 2013.
While the OMB report and other communications with the United States Department of Defense (U.S. DoD) indicate that there would likely be reductions to our defense business, the U.S. DoD is in the process of identifying specific program and contract reductions required by the FY2013 sequestration order. As such, at this time we cannot determine how sequestration will impact the Company's specific programs and contracts. Any reductions, cancellations or delays impacting existing contracts or programs could have a material effect on our results of operations, financial position and/or cash flows.
BDS Fixed-Price Development Contracts
Fixed-price development work is inherently uncertain and subject to significant variability in estimates of the cost and time required to complete the work. BDS fixed-price contracts with significant development work include Airborne Early Warning and Control, Family of Advanced Beyond Line-of-Sight Terminals, India P-8I, Saudi Arabia F-15, USAF KC-46A Tanker and commercial and military satellites. The operational and technical complexities of these contracts create financial risk, which could trigger termination provisions, order cancellations or other financially significant exposure. Changes to cost and revenue estimates could also result in lower margins or a material charge for reach-forward losses during the next 12 months.
747 and 787 Commercial Airplane Programs
The development and initial production of new commercial airplanes and new commercial airplane derivatives, which include the 747 and 787, entail significant commitments to customers and suppliers as well as substantial investments in working capital, infrastructure and research and development. The 747 and 787 programs have gross margins that are breakeven or near breakeven at March 31, 2013.
Continued weakness in the air cargo market and lower-than-expected demand for large commercial passenger aircraft have resulted in pricing pressures and fewer 747 orders than anticipated. While we received additional orders for aircraft in the first quarter of 2013, we continue to have a number of unsold Freighter and Intercontinental production positions beyond 2013. If we are unable to obtain orders for multiple Freighter aircraft in 2013 consistent with our near-term production plans, we may be required to take actions including further reducing the production rate and/or building airplanes for which we have not received firm orders. If market and production risks cannot be mitigated, the program could face an additional reach-forward loss that may be material.
The cumulative impacts of production challenges, change incorporation, schedule delays and customer and supplier impacts have created significant pressure on 787 program profitability. If risks related to this program, including risks associated with change incorporation, the battery incidents and associated regulatory directives, planned production rate increases, or introducing the 787-9 derivative as scheduled cannot be mitigated, the program could face additional customer claims and/or supplier assertions, as well as a reach-forward loss that may be material.
Note 10 – Arrangements with Off-Balance Sheet Risk
We enter into arrangements with off-balance sheet risk in the normal course of business, primarily in the form of guarantees.
The following table provides quantitative data regarding our third party guarantees. The maximum potential payments represent a “worst-case scenario,” and do not necessarily reflect amounts that we expect to pay. Estimated proceeds from collateral and recourse represent the anticipated values of assets we could liquidate or receive from other parties to offset our payments under guarantees. The carrying amount of liabilities represents the amount included in Accrued liabilities.
|
| | | | | | | | | | | | | | | | | | | | |
| Maximum Potential Payments | | Estimated Proceeds from Collateral/Recourse | | Carrying Amount of Liabilities |
| March 31 2013 |
| December 31 2012 |
| | March 31 2013 |
| December 31 2012 |
| | March 31 2013 |
| December 31 2012 |
|
Contingent repurchase commitments |
| $2,170 |
|
| $2,065 |
| |
| $2,169 |
|
| $2,065 |
| |
| $5 |
|
| $5 |
|
Indemnifications to ULA: | | | | | | | | |
Contributed Delta program launch inventory | 137 |
| 137 |
| | | | | | |
Contract pricing | 261 |
| 261 |
| | | | | 7 |
| 7 |
|
Other Delta contracts | 232 |
| 232 |
| | | | | 8 |
| 8 |
|
Other indemnifications | 128 |
| 137 |
| | | | | 32 |
| 32 |
|
Contingent Repurchase Commitments The repurchase price specified in contingent repurchase commitments is generally lower than the expected fair value at the specified repurchase date. Estimated proceeds from collateral/recourse in the table above represent the lower of the contracted repurchase price or the expected fair value of each aircraft at the specified repurchase date.
Indemnifications to ULA In 2006, we agreed to indemnify ULA through December 31, 2020 against potential non-recoverability and non-allowability of $1,360 of Boeing Delta launch program inventory included in contributed assets plus $1,860 of inventory subject to an inventory supply agreement which ends on March 31, 2021. Since inception, ULA has consumed $1,223 of the $1,360 of inventory that was contributed by us and has yet to consume $137. ULA has made advance payments of $1,080 to us and we have recorded revenues and cost of sales of $795 under the inventory supply agreement through March 31, 2013.
We agreed to indemnify ULA against potential losses that ULA may incur in the event ULA is unable to obtain certain additional contract pricing from the USAF for four satellite missions. We believe ULA is entitled to additional contract pricing. In December 2008, ULA submitted a claim to the USAF to re-price the contract value for two satellite missions. In March 2009, the USAF issued a denial of that claim. In June 2009, ULA filed a notice of appeal, and in October 2009, ULA filed a complaint before the Armed Services Board of Contract Appeals (ASBCA) for a contract adjustment for the price of the two satellite missions. In September 2009, the USAF exercised its option for a third satellite mission. During the third quarter of 2010, ULA submitted a claim to the USAF to re-price the contract value of the third mission. The USAF did not exercise an option for a fourth mission prior to the expiration. In March 2011, ULA filed a notice of appeal before the ASBCA, seeking to re-price the third mission. A hearing before the ASBCA has been scheduled for November 18, 2013. On March 1, 2013, the USAF filed two motions for summary judgment before the ASBCA. ULA's oppositions to these motions were filed on April 19, 2013. There is no deadline for the ASBCA to rule on these motions. If ULA is unsuccessful in obtaining additional pricing, we may be responsible for a portion of the shortfall and may record up to $279 in pre-tax losses associated with the three missions, representing
up to $261 for the indemnification payment and up to $18 for our portion of additional contract losses incurred by ULA.
Potential payments for Other Delta contracts include $85 related to deferred support costs. In June 2011, the Defense Contract Management Agency (DCMA) notified ULA that it had determined that $271 of deferred support costs are not recoverable under government contracts. In December 2011, the DCMA notified ULA of the potential non-recoverability of an additional $114 of deferred production costs. The DCMA has not yet issued a final decision related to the recoverability of the $114. ULA and Boeing believe that all costs are recoverable and in November 2011, ULA filed a certified claim with the USAF for collection of deferred support and production costs. The USAF issued a final decision denying ULA’s certified claim in May 2012. On June 14, 2012, Boeing and ULA filed a suit in the Court of Federal Claims seeking recovery of the deferred support and production costs from the U.S. government. On November 9, 2012, the U.S. government filed an answer to our claim and asserted a counterclaim for credits that it alleges were offset by deferred support cost invoices. We believe that the U.S. government’s counterclaim is without merit, and have filed an answer challenging it on multiple grounds. The litigation proceeds, with no trial date having yet been set. If, contrary to our belief, it is determined that some or all of the deferred support or production costs are not recoverable, we could be required to record pre-tax losses and make indemnification payments to ULA for up to $317 of the costs questioned by the DCMA.
Other Indemnifications As part of the 2004 sale agreement with General Electric Capital Corporation related to the sale of Boeing Capital’s (BCC) Commercial Financial Services business, BCC is involved in a loss sharing arrangement for losses on transferred portfolio assets, such as asset sales, provisions for loss or asset impairment charges offset by gains from asset sales. At March 31, 2013 and December 31, 2012, our maximum future cash exposure to losses associated with the loss sharing arrangement was $128 and $137 and our accrued liability under the loss sharing arrangement was $32 and $32.
In conjunction with our sales of the Electron Dynamic Devices, Inc. and Rocketdyne Propulsion and Power businesses and the sale of our Commercial Airplanes facilities in Wichita, Kansas and Tulsa and McAlester, Oklahoma in 2005, we agreed to indemnify, for an indefinite period, the buyers for costs relating to pre-closing environmental contamination and certain other items. As it is impossible to assess whether there will be damages in the future or the amounts thereof (if any), we cannot estimate the maximum potential amount of future payments under these indemnities. Therefore, no liability has been recorded. There have been no claims submitted to date.
Note 11 – Postretirement Plans
The components of net periodic benefit cost were as follows:
|
| | | | | | | | | | | | | | | |
| Pension | | Other Postretirement Benefits |
Three months ended March 31, | 2013 |
| | 2012 |
| | 2013 |
| | 2012 |
|
Service cost |
| $473 |
| |
| $411 |
| |
| $37 |
| |
| $36 |
|
Interest cost | 731 |
| | 751 |
| | 67 |
| | 79 |
|
Expected return on plan assets | (969 | ) | | (958 | ) | | (2 | ) | | (2 | ) |
Amortization of prior service costs | 49 |
| | 56 |
| | (45 | ) | | (49 | ) |
Recognized net actuarial loss | 569 |
| | 484 |
| | 24 |
| | 30 |
|
Settlement and curtailment loss/(gain) | 20 |
| | 7 |
| |
|
| | (2 | ) |
Net periodic benefit cost |
| $873 |
| |
| $751 |
| |
| $81 |
| |
| $92 |
|
Net periodic benefit cost included in Earnings from operations |
| $791 |
| |
| $655 |
| |
| $91 |
| |
| $149 |
|
We did not make any discretionary pension contributions during the three months ended March 31, 2013 or 2012.
Note 12 – Share-Based Compensation and Other Compensation Arrangements
Stock Options
On February 25, 2013, we granted to our executives 6,591,968 options with an exercise price equal to the fair market value of our stock on the date of grant and which expire 10 years after the date of grant. The stock options vest over a period of three years, with 34% vesting after the first year, 33% vesting after the second year and the remaining 33% vesting after the third year. The grant-date fair value of each stock option was $15.85.
Restricted Stock Units
On February 25, 2013, we granted to our executives 1,375,414 restricted stock units (RSUs) as part of our long-term incentive program with a grant date fair value of $75.97 per share. The RSUs granted under this program will vest and settle in common stock (on a one-for-one basis) on the third anniversary of the grant date.
Performance Awards
On February 25, 2013, we granted to our executives Performance Awards with the payout based on the achievement of financial goals for the three-year period ending December 31, 2015. The minimum payout amount is $0 and the maximum payout is $285.
Note 13 - Shareholders' Equity
Accumulated Other Comprehensive Loss
Changes in Accumulated other comprehensive loss (AOCI) by component for the three months ended March 31, 2013 were as follows:
|
| | | | | | | | | | | | | | | | | | | |
| Currency Translation Adjustments |
| | Unrealized Gains and Losses on Certain Investments |
| | Unrealized Gains and Losses on Derivative Instruments |
| | Defined Benefit Pension Plans & Other Postretirement Benefits |
| | Total (1) |
|
Balance January 1, 2013 |
| $214 |
| |
| ($8 | ) | |
| $86 |
| |
| ($17,708 | ) | |
| ($17,416 | ) |
OCI before reclassifications | (23 | ) | |
| | (26 | ) | | 32 |
| | (17 | ) |
Amounts reclassified from AOCI |
| |
| | 2 |
| | 390 |
| (2) | 392 |
|
Net current period OCI | (23 | ) | |
| | (24 | ) | | 422 |
| | 375 |
|
Balance March 31, 2013 |
| $191 |
| |
| ($8 | ) | |
| $62 |
| |
| ($17,286 | ) | |
| ($17,041 | ) |
| |
(2) | Primarily relates to amortization of actuarial gains/losses recorded in the period totaling $378 (net of tax of $215) which is included in the net periodic pension cost of which a portion is allocated to production as inventoried costs. |
Note 14 – Derivative Financial Instruments
Cash Flow Hedges
Our cash flow hedges include foreign currency forward contracts, foreign currency option contracts, commodity swaps, and commodity purchase contracts. We use foreign currency forward and option contracts to manage currency risk associated with certain transactions, specifically forecasted sales and purchases made in foreign currencies. Our foreign currency contracts hedge forecasted transactions principally occurring within five years in the future, with certain contracts hedging transactions up to 2023. We use commodity derivatives, such as swaps and fixed-price purchase commitments to hedge against potentially unfavorable price changes for items used in production. Our commodity contracts hedge forecasted transactions through 2016.
Fair Value Hedges
Interest rate swaps under which we agree to pay variable rates of interest are designated as fair value hedges of fixed-rate debt. The net change in fair value of the derivatives and the hedged items is reported in BCC interest expense.
Derivative Instruments Not Receiving Hedge Accounting Treatment
We also hold certain derivative instruments, primarily foreign currency forward contracts, for risk management purposes that are not receiving hedge accounting treatment.
Notional Amounts and Fair Values
The notional amounts and fair values of derivative instruments in the Condensed Consolidated Statements of Financial Position were as follows:
|
| | | | | | | | | | | | | | | | | | |
| Notional amounts (1) | Other assets | Accrued liabilities |
| March 31 2013 |
| December 31 2012 |
| March 31 2013 |
| December 31 2012 |
| March 31 2013 |
| December 31 2012 |
|
Derivatives designated as hedging instruments: | | | | | | |
Foreign exchange contracts |
| $2,375 |
|
| $2,310 |
|
| $180 |
|
| $202 |
|
| ($34 | ) |
| ($16 | ) |
Interest rate contracts | 313 |
| 388 |
| 24 |
| 26 |
|
|
| |
Commodity contracts | 81 |
| 99 |
|
|
| (62 | ) | (71 | ) |
Derivatives not receiving hedge accounting treatment: | | | | | | |
Foreign exchange contracts | 340 |
| 412 |
| 5 |
| 3 |
| (43 | ) | (42 | ) |
Commodity contracts | 16 |
| 15 |
|
|
|
|
| (8 | ) | (8 | ) |
Total derivatives | 3,125 |
| 3,224 |
| 209 |
| 231 |
| (147 | ) | (137 | ) |
Netting arrangements | | | (59 | ) | (53 | ) | 59 |
| 53 |
|
Net recorded balance | | |
| $150 |
|
| $178 |
|
| ($88 | ) |
| ($84 | ) |
| |
(1) | Notional amounts represent the gross contract/notional amount of the derivatives outstanding. |
Gains/(losses) associated with our cash flow and undesignated hedging transactions and their effect on Other comprehensive loss and Net earnings were as follows:
|
| | | | | | | |
| Three months ended March 31 |
| 2013 |
| | 2012 |
|
Effective portion recognized in other comprehensive loss, net of taxes: | | | |
Foreign exchange contracts |
| ($26 | ) | |
| $32 |
|
Commodity contracts |
|
| | (14 | ) |
Effective portion reclassified out of Accumulated other comprehensive loss into earnings, net of taxes: | | | |
Foreign exchange contracts | 3 |
| | 7 |
|
Commodity contracts | (5 | ) | | (7 | ) |
Forward points recognized in Other income/(expense), net: | | | |
Foreign exchange contracts | 8 |
| | (4 | ) |
Undesignated derivatives recognized in Other income/(expense), net: | | | |
Foreign exchange contracts | (2 | ) | | 4 |
|
Based on our portfolio of cash flow hedges, we expect to reclassify gains of $43 (pre-tax) out of Accumulated other comprehensive loss into earnings during the next 12 months. Ineffectiveness related to our hedges recognized in Other income/(expense) was insignificant for the three months ended March 31, 2013 and 2012.
We have derivative instruments with credit-risk-related contingent features. For foreign exchange contracts with original maturities of at least five years, our derivative counterparties could require settlement if we default on our five-year credit facility. For commodity contracts, our counterparties could require collateral posted in an amount determined by our credit ratings. The fair value of foreign exchange and commodity contracts that have credit-risk-related contingent features that are in a net liability position at March 31, 2013 was $10. At March 31, 2013, there was no collateral posted related to our derivatives.
Note 15 – Fair Value Measurements
The following table presents our assets and liabilities that are measured at fair value on a recurring basis and are categorized using the fair value hierarchy. The fair value hierarchy has three levels based on the reliability of the inputs used to determine fair value. Level 1 refers to fair values determined based on quoted prices in active markets for identical assets. Level 2 refers to fair values estimated using significant other observable inputs and Level 3 includes fair values estimated using significant unobservable inputs.
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| March 31, 2013 | | December 31, 2012 |
| Total |
| | Level 1 |
| | Level 2 |
| | Level 3 |
| | Total |
| | Level 1 |
| | Level 2 |
| | Level 3 |
|
Assets | | | | | | | | | | | | | | | |
Money market funds |
| $3,569 |
| |
| $3,569 |
| | | | | |
| $4,534 |
| |
| $4,534 |
| | | | |
Available-for-sale investments | 9 |
| | 6 |
| | | |
| $3 |
| | 9 |
| | 6 |
| | | |
| $3 |
|
Derivatives | 150 |
| | | |
| $150 |
| | | | 178 |
| | | |
| $178 |
| | |
Total assets |
| $3,728 |
| |
| $3,575 |
| |
| $150 |
| |
| $3 |
| |
| $4,721 |
| |
| $4,540 |
| |
| $178 |
| |
| $3 |
|
Liabilities | | | | | | | | | | | | | | | |
Derivatives |
| ($88 | ) | | | |
| ($88 | ) | | | |
| ($84 | ) | | | |
| ($84 | ) | | |
Total liabilities |
| ($88 | ) | |
| |
| ($88 | ) | |
| |
| ($84 | ) | |
| |
| ($84 | ) | |
|
Money market funds and available-for-sale equity securities are valued using a market approach based on the quoted market prices of identical instruments. Available-for-sale debt investments are primarily valued using an income approach based on benchmark yields, reported trades and broker/dealer quotes.
Derivatives include foreign currency, commodity and interest rate contracts. Our foreign currency forward contracts are valued using an income approach based on the present value of the forward rate less the contract rate multiplied by the notional amount. Commodity derivatives are valued using an income approach based on the present value of the commodity index prices less the contract rate multiplied by the notional amount. The fair value of our interest rate swaps is derived from a discounted cash flow analysis based on the terms of the contract and the interest rate curve.
Certain assets have been measured at fair value on a nonrecurring basis using significant unobservable inputs (Level 3). The following table presents the nonrecurring losses recognized for the three months ended March 31 and the fair value and asset classification of the related assets as of the impairment date:
|
| | | | | | | | | | | | | | | |
| 2013 | | 2012 |
| Fair Value |
| | Total Losses |
| | Fair Value |
| | Total Losses |
|
Equipment under operating leases & Assets held for sale or re-lease |
| $28 |
| |
| ($21 | ) | |
| $25 |
| |
| ($31 | ) |
Property, plant and equipment | 6 |
| | (5 | ) | |
|
| |
|
|
Total |
| $34 |
| |
| ($26 | ) | |
| $25 |
| |
| ($31 | ) |
The fair value of the impaired equipment under operating lease is derived by calculating a median collateral value from a consistent group of third party aircraft value publications. The values provided by the third party aircraft publications are derived from their knowledge of market trades and other market factors. Management reviews the publications quarterly to assess the continued appropriateness and consistency with market trends. Under certain circumstances, we adjust values based on the attributes and condition of the specific aircraft or equipment, usually when the features or use of the aircraft vary significantly from the more generic aircraft attributes covered by third party publications, or on the expected net sales price for the aircraft. Property, plant and equipment was primarily valued using an income approach based on the discounted cash flows associated with the underlying assets.
For Level 3 assets that were measured at fair value on a non-recurring basis during the three months ended March 31, 2013, the following table presents the fair value of those assets as of the measurement date, valuation techniques and related unobservable inputs of those assets.
|
| | | | | | | |
| Fair Value | | Valuation Technique(s) | | Unobservable Input | | Range Median or Average |
Equipment under operating leases & Assets held for sale or re-lease | $28 | | Market approach | | Aircraft value publications | | $18 - $34(1) Median $30 |
| | Aircraft condition adjustments | | ($7) - $5(2) Net ($2) |
| |
(1) | The range represents the sum of the highest and lowest values for all aircraft subject to fair value measurement, according to the third party aircraft valuation publications that we use in our valuation process. |
| |
(2) | The negative amount represents the sum for all aircraft subject to fair value measurement, of all downward adjustments based on consideration of individual aircraft attributes and condition. The positive amount represents the sum of all such upward adjustments. |
Fair Value Disclosures
The fair values and related carrying values of financial instruments that are not required to be remeasured at fair value on the Condensed Consolidated Statements of Financial Position were as follows:
|
| | | | | | | | | | | | | |
| March 31, 2013 |
| Carrying Amount |
| Total Fair Value |
| Level 1 | Level 2 |
| Level 3 |
|
Assets | | | | | |
Accounts receivable, net |
| $6,351 |
|
| $6,326 |
| |
| $6,326 |
| |
Notes receivable, net | 649 |
| 707 |
| | 707 |
| |
Liabilities | | | | | |
Debt, excluding capital lease obligations | (9,025 | ) | (10,825 | ) | | (10,778 | ) |
| ($47 | ) |
|
| | | | | | | | | | | | | |
| December 31, 2012 |
| Carrying Amount |
| Total Fair Value |
| Level 1 | Level 2 | Level 3 |
Assets | | | | | |
Accounts receivable, net |
| $5,608 |
|
| $5,642 |
| |
| $5,642 |
| |
Notes receivable, net | 571 |
| 632 |
| | 632 |
| |
Liabilities | | | | | |
Debt, excluding capital lease obligations | (10,231 | ) | (12,269 | ) | | (12,221 | ) |
| ($48 | ) |
The fair value of Accounts receivable is based on current market rates for loans of the same risk and maturities. The fair values of our variable rate notes receivable that reprice frequently approximate their carrying amounts. The fair values of fixed rate notes receivable are estimated with discounted cash flow analysis using interest rates currently offered on loans with similar terms to borrowers of similar credit quality. The fair value of our debt that is traded in the secondary market is classified as Level 2 and is based on current market yields. For our debt that is not traded in the secondary market, the fair value is classified as Level 2 and is based on our indicative borrowing cost derived from dealer quotes or discounted cash flows. The fair value of our debt classified as Level 3 is based on the median of the underlying collateral value as described above. With regard to other financial instruments with off-balance sheet risk, it is not practicable to estimate the fair value of our indemnifications because the amount and timing of those arrangements are uncertain. Items not included in the above disclosures include cash, restricted cash, time deposits and other deposits, commercial paper, money market funds, Accounts payable and long-term payables. The carrying values of those items, as reflected in the Condensed Consolidated Statements of Financial Position, approximate their fair value at March 31, 2013 and December 31, 2012. The fair value of assets and liabilities whose carrying value approximates fair value is determined using Level 2 inputs, with the exception of cash (Level 1).
Note 16 – Legal Proceedings
Various legal proceedings, claims and investigations related to products, contracts and other matters are pending against us. Potentially material contingencies including A-12 and Employment, Labor and Benefits litigation are discussed below.
We are subject to various U.S. government investigations, from which civil, criminal or administrative proceedings could result or have resulted. Such proceedings involve or could involve claims by the government for fines, penalties, compensatory and treble damages, restitution and/or forfeitures. Under government regulations, a company, or one or more of its operating divisions or subdivisions, can also be suspended or debarred from government contracts, or lose its export privileges, based on the results of investigations. We believe, based upon current information, that the outcome of any such government disputes and investigations will not have a material effect on our financial position, results of operations, or cash flows, except as set forth below. Where it is reasonably possible that we will incur losses in excess of recorded amounts in connection with any of the matters set forth below, we have disclosed either the amount
or range of reasonably possible losses in excess of such amounts or, where no such amount or range can be reasonably estimated, the reasons why no such estimate can be made.
A-12 Litigation
In 1991, the Department of the Navy (the Navy) notified McDonnell Douglas Corporation (now merged into The Boeing Company) and General Dynamics Corporation (together, the Team) that it was terminating for default the Team’s contract for development and initial production of the A-12 aircraft.
The Team had full responsibility for performance of the contract and both contractors are jointly and severally liable for any potential liabilities resulting from the termination. The Team filed a legal action to contest the Navy’s default termination, to assert its rights to convert the termination to one for “the convenience of the government,” and to obtain payment for work done and costs incurred on the A-12 contract but not paid to date. As of March 31, 2013, inventories included approximately $587 of recorded costs on the A-12 contract, against which we have established a loss provision of $350. The amount of the provision, which was established in 1990, was based on McDonnell Douglas Corporation’s belief, supported by an opinion of outside counsel, that the termination for default would be converted to a termination for convenience, and that the best estimate of possible loss on termination for convenience was $350.
The U.S. Court of Federal Claims held that the default termination decision could not be sustained and on March 31, 1998, awarded the Team $1,200 in unreimbursed costs. The Court of Appeals for the Federal Circuit reversed in July 1999 and remanded the case back to the trial court to determine whether the Team was in fact in default. On August 31, 2001, the U.S. Court of Federal Claims issued a decision after trial upholding the government’s default termination of the A-12 contract. In 2003, the Court of Appeals for the Federal Circuit, finding that the trial court had applied the wrong legal standard, vacated the trial court’s 2001 decision and ordered the case sent back to the trial court for further proceedings. On May 3, 2007, the U.S. Court of Federal Claims issued a decision upholding the government’s default termination of the A-12 contract. We filed a Notice of Appeal on May 4, 2007 with the Court of Appeals for the Federal Circuit. On June 2, 2009, the Court of Appeals rendered an opinion affirming the trial court’s 2007 decision sustaining the government’s default termination. On May 23, 2011, the U.S. Supreme Court vacated the decision of the Court of Appeals upholding the default termination, and remanded the case to the Court of Appeals. On July 7, 2011, the Court of Appeals remanded the case to the trial court for additional factual determinations. The trial court has scheduled oral argument for May 7, 2013. On December 29, 2009, the Navy sent letters to the Team requesting payment of $1,352 in unliquidated progress payments, plus applicable interest. On November 15, 2011, the Navy sent a letter confirming that it would not pursue payment from the Team pending all trial court and appellate proceedings adjudicating the issues remanded by the Supreme Court.
We believe that the termination for default is contrary to law and fact and that the loss provision established by McDonnell Douglas Corporation in 1990, which was supported by an opinion from outside counsel, continues to provide adequately for the reasonably possible reduction in value of A-12 net contracts in process as of March 31, 2013. Final resolution of the A-12 litigation will depend on the outcome of further proceedings or possible negotiations with the U.S. government. If after all legal proceedings are concluded, the court determines, contrary to our belief, that a termination for default was appropriate, we could incur an additional loss of up to $275, consisting principally of $237 of remaining inventory costs. If the courts further hold that a money judgment should be entered against the Team, we could be required to pay the U.S. government up to one-half of the unliquidated progress payments of $1,350 plus statutory interest from February 1991 (currently totaling up to $1,590). In that event, our loss would total approximately $1,743 in pre-tax charges. Should, however, the March 31, 1998 judgment of the U.S. Court of Federal Claims in favor of the Team be reinstated, we could be entitled to receive payment of approximately $1,189, including interest from June 26, 1991.
Employment, Labor and Benefits Litigation
In connection with the 2005 sale of our former Wichita facility to Spirit AeroSystems, Inc. (Spirit), certain individuals not hired by Spirit alleged that Spirit’s hiring decisions following the sale were tainted by age discrimination, violated ERISA, violated our collective bargaining agreements, and constituted retaliation.
The case was brought in 2006 as a class action on behalf of individuals not hired by Spirit. In 2012, the Tenth Circuit Court of Appeals affirmed the district court's 2010 summary judgment in favor of Boeing and Spirit on all class action claims, but the parties were not precluded from making claims on an individual basis. As of March 31, 2013, eighty-nine individuals have asserted individual claims related to this matter. Spirit has agreed to indemnify Boeing for any and all losses.
Also related to the 2005 sale of the former Wichita facility, on February 16, 2007, an action entitled Harkness et al. v. The Boeing Company et al. was filed in the U.S. District Court for the District of Kansas, alleging collective bargaining agreement breaches and ERISA violations in connection with alleged failures to provide benefits to certain former employees of the Wichita facility. On December 11, 2012 the court denied plaintiffs’ motion for summary judgment and granted Boeing’s motion for summary judgment on plaintiffs’ claim that amendment of The Boeing Company Employee Retirement Plan violated the IAM collective bargaining agreement, as well as individual ERISA §510 claims for interference with benefits. The court denied Boeing’s motion for all other claims. The parties are preparing to conduct additional discovery in anticipation of further court proceedings, which have not yet been scheduled. We believe that Spirit is obligated to indemnify Boeing for any and all losses in this matter, although to date Spirit has acknowledged a limited indemnification obligation. We currently estimate that the putative class includes 2,000 former Wichita employees. We cannot reasonably estimate the range of loss, if any, that may result from both these matters given the current procedural status of the litigation.
On October 13, 2006, we were named as a defendant in a lawsuit filed in the U.S. District Court for the Southern District of Illinois. Plaintiffs, seeking to represent a class of similarly situated participants and beneficiaries in The Boeing Company Voluntary Investment Plan (the VIP), alleged that fees and expenses incurred by the VIP were and are unreasonable and excessive, not incurred solely for the benefit of the VIP and its participants, and were undisclosed to participants. The plaintiffs further alleged that defendants breached their fiduciary duties in violation of §502(a)(2) of ERISA, and sought injunctive and equitable relief pursuant to §502(a)(3) of ERISA. During the first quarter of 2010, the Seventh Circuit Court of Appeals granted a stay of trial proceedings in the district court pending resolution of an appeal made by Boeing in 2008 to the case’s class certification order. On January 21, 2011, the Seventh Circuit reversed the district court’s class certification order and decertified the class. The Seventh Circuit remanded the case to the district court for further proceedings. On March 2, 2011, plaintiffs filed an amended motion for class certification and a supplemental motion on August 7, 2011. Boeing’s opposition to class certification was filed on September 6, 2011. Plaintiffs’ reply brief in support of class certification was filed on September 27, 2011. The court has stated its intent to issue rulings on the amended motion for class certification and the alternative motion to proceed as a direct action for breach of fiduciary duty and then stay the case until it is determined if an appeal of the class certification order is filed. As a result, on September 19, 2012 the district court issued an order denying Boeing’s motions for summary judgment as premature pending class determination. The Company cannot reasonably estimate the range of loss, if any, that may result from this matter given the current procedural status of the litigation.
Civil Securities Litigation
On November 13, 2009, plaintiff shareholders filed a putative securities fraud class action against The Boeing Company and two of our senior executives in federal district court in Chicago. This lawsuit arose from our June 2009 announcement that the first flight of the 787 Dreamliner would be postponed due to a need to reinforce an area within the side-of-body section of the aircraft. Plaintiffs contended that we were aware before June 2009 that the first flight could not take place as scheduled due to issues with the side-of-body section of the aircraft, and that our determination not to announce this delay earlier resulted in an artificial inflation of our stock price for a multi-week period in May and June 2009. On March 7, 2011, the Court dismissed the complaint with prejudice and, on March 19, 2012, the Court denied the plaintiffs' request to reconsider that order. On April 12, 2012, plaintiffs filed a Notice of Appeal, and on April 25, 2012, Boeing filed a Notice of Cross-Appeal based on the district court's failure to award sanctions against the plaintiffs. On March 26, 2013, the Seventh Circuit Court of Appeals affirmed the dismissal of the complaint. The appeals court remanded the case to the district court for the sole purpose of determining whether sanctions should be imposed on the plaintiffs' counsel and, if so, in what amount. We expect those proceedings to occur by the end of the second quarter of 2013.
Note 17 – Segment Information
Effective January 1, 2013, certain programs were realigned among BDS segments. Business segment data for all periods presented have been adjusted to reflect the realignment. Effective January 1, 2013, BCC's accounting policies for certain leasing transactions were aligned with Boeing's consolidated accounting policies. Segment information previously reported has been adjusted to reflect this change. The resulting adjustments affected the BCC and Other segments as well as consolidated amounts reported for Boeing Capital interest expense, Earnings from operations, and Interest and debt expense.
Our primary profitability measurements to review a segment’s operating results are Earnings from operations and operating margins. See page 6 for a Summary of Business Segment Data, which is an integral part of this note.
Intersegment revenues, eliminated in Unallocated items and eliminations, are shown in the following table.
|
| | | | | | | |
| Three months ended March 31 |
| 2013 |
| | 2012 |
|
Commercial Airplanes |
| $195 |
| |
| $128 |
|
Boeing Capital | 9 |
| | 12 |
|
Total |
| $204 |
| |
| $140 |
|
During the three months ended March 31, 2013 and 2012, Other segment's Loss from operations included $12 and $38 related to support provided to BCC.
Unallocated items and eliminations includes costs not attributable to business segments as well as intercompany profit eliminations. We generally allocate costs to business segments based on the U.S. federal cost accounting standards. Unallocated pension and other postretirement expense represents the portion of pension and other postretirement costs that are not recognized by business segments for segment reporting purposes. The business segments have traditionally been allocated pension and other postretirement costs using U.S. Government Cost Accounting Standards (CAS), which employ different actuarial assumptions and accounting conventions than Generally Accepted Accounting Principles in the United States of America (GAAP). Beginning in 2013, pension costs, comprising GAAP service and prior service costs, are allocated to Commercial Airplanes. BDS continues to be allocated CAS pension costs which are allocable to government contracts. Other postretirement costs will continue to be allocated to business segments based on CAS, which is generally based on benefits paid. Prior year allocations have not been adjusted. Components of Unallocated items and eliminations are shown in the following table.
|
| | | | | | | |
| Three months ended March 31 |
| 2013 |
| | 2012 |
|
Share-based plans |
| ($31 | ) | |
| ($22 | ) |
Deferred compensation | (56 | ) | | (36 | ) |
Capitalized interest | (17 | ) | | (21 | ) |
Eliminations and other | (66 | ) | | 75 |
|
Sub-total | (170 | ) | | (4 | ) |
Pension | (358 | ) | | (189 | ) |
Postretirement | 19 |
| | (19 | ) |
Pension and Postretirement | (339 | ) | | (208 | ) |
Total |
| ($509 | ) | |
| ($212 | ) |
Segment assets are summarized in the table below:
|
| | | | | | | |
| March 31 2013 |
| | December 31 2012 |
|
Commercial Airplanes |
| $44,360 |
| |
| $41,769 |
|
Defense, Space & Security: | | | |
Boeing Military Aircraft | 6,885 |
| | 6,582 |
|
Network & Space Systems | 6,662 |
| | 6,669 |
|
Global Services & Support | 3,862 |
| | 3,692 |
|
Total Defense, Space & Security | 17,409 |
| | 16,943 |
|
Boeing Capital | 4,281 |
| | 4,347 |
|
Other segment | 1,106 |
| | 1,043 |
|
Unallocated items and eliminations | 23,291 |
| | 24,794 |
|
Total |
| $90,447 |
| |
| $88,896 |
|
Assets included in Unallocated items and eliminations primarily consist of cash, net deferred tax assets, capitalized interest and assets held by SSG as well as intercompany eliminations.
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Board of Directors and Shareholders of
The Boeing Company
Chicago, Illinois
We have reviewed the accompanying condensed consolidated statement of financial position of The Boeing Company and subsidiaries (the “Company”) as of March 31, 2013, and the related condensed consolidated statements of operations, comprehensive income, cash flows and equity for the three-month periods ended March 31, 2013 and 2012. These interim financial statements are the responsibility of the Company’s management.
We conducted our reviews in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board (United States), the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.
Based on our reviews, we are not aware of any material modifications that should be made to such condensed consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.
We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated statement of financial position of the Company as of December 31, 2012, and the related consolidated statements of operations, comprehensive income, equity, and cash flows for the year then ended (not presented herein); and in our report dated February 11, 2013, we expressed an unqualified opinion on those consolidated financial statements and included an explanatory paragraph relating to the Company's retrospective adoption during the year ended December 31, 2012 of new accounting guidance related to the presentation of comprehensive income. In our opinion, the information set forth in the accompanying condensed consolidated statement of financial position as of December 31, 2012 is fairly stated, in all material respects, in relation to the consolidated statement of financial position from which it has been derived.
/s/ DELOITTE & TOUCHE LLP
Chicago, Illinois
April 24, 2013
|
| |
FORWARD-LOOKING STATEMENTS |
This report contains “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Words such as “may,” “should,” “expects,” “intends,” “projects,” “plans,” “believes,” “estimates,” “targets,” “anticipates” and similar expressions are used to identify these forward-looking statements. Examples of forward-looking statements include statements relating to our future financial condition and operating results, as well as any other statement that does not directly relate to any historical or current fact. |
| |
Forward-looking statements are based on our current expectations and assumptions, which may not prove to be accurate. These statements are not guarantees and are subject to risks, uncertainties and changes in circumstances that are difficult to predict. Many factors could cause actual results to differ materially and adversely from these forward-looking statements. Among these factors are risks related to: |
| |
(1) | general conditions in the economy and our industry, including those due to regulatory changes; |
| |
(2) | our reliance on our commercial airline customers; |
| |
(3) | the overall health of our aircraft production system, planned production rate increases across multiple commercial airline programs, our commercial development and derivative aircraft programs, and our aircraft being subject to stringent performance and reliability standards; |
| |
(4) | changing acquisition priorities of the U.S. government; |
| |
(5) | our dependence on U.S. government contracts; |
| |
(6) | our reliance on fixed-price contracts; |
| |
(7) | our reliance on cost-type contracts; |
| |
(8) | uncertainties concerning contracts that include in-orbit incentive payments; |
| |
(9) | our dependence on our subcontractors and suppliers as well as the availability of raw materials; |
| |
(10) | changes in accounting estimates; |
| |
(11) | changes in the competitive landscape in our markets; |
| |
(12) | our non-U.S. operations, including sales to non-U.S. customers; |
| |
(13) | potential adverse developments in new or pending litigation and/or government investigations; |
| |
(14) | customer and aircraft concentration in Boeing Capital’s customer financing portfolio; |
| |
(15) | changes in our ability to obtain debt on commercially reasonable terms and at competitive rates in order to fund our operations and contractual commitments; |
| |
(16) | realizing the anticipated benefits of mergers, acquisitions, joint ventures, strategic alliances or divestitures; |
| |
(17) | the adequacy of our insurance coverage to cover significant risk exposures; |
|
| |
(18) | potential business disruptions, including those related to physical security threats, information technology or cyber attacks or natural disasters; |
| |
(19) | work stoppages or other labor disruptions; |
| |
(20) | significant changes in discount rates and actual investment return on pension assets; |
| |
(21) | potential environmental liabilities; and |
| |
(22) | threats to the security of our or our customers’ information. |
| |
Additional information concerning these and other factors can be found in our filings with the Securities and Exchange Commission, including the “Risk Factors” on pages 6 through 15 of our most recent Annual Report on Form 10-K, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and Notes 9, 10, and 16 to our Condensed Consolidated Financial Statements included in this Quarterly Report on Form 10-Q and Current Reports on Form 8-K. Any forward-looking information speaks only as of the date on which it is made, and we assume no obligation to update or revise any forward-looking statement whether as a result of new information, future events or otherwise, except as required by law. |
| |
| |
| |
| |
| |
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations
Consolidated Operating Results
Earnings From Operations and Core Operating Earnings (Non-GAAP)
The following table summarizes key indicators of consolidated results of operations:
|
| | | | | | | |
(Dollars in millions, except per share data) | Three months ended March 31 |
| 2013 |
| | 2012 |
|
Revenues |
| $18,893 |
| |
| $19,383 |
|
| | | |
GAAP | | | |
Earnings from operations |
| $1,528 |
| |
| $1,565 |
|
Operating margins | 8.1 | % | | 8.1 | % |
Effective income tax rate | 23.1 | % | | 36.8 | % |
Net earnings from continuing operations |
| $1,106 |
| |
| $924 |
|
Diluted earnings per share |
| $1.44 |
| |
| $1.22 |
|
| | | |
Non-GAAP (1) | | | |
Core operating earnings |
| $1,867 |
| |
| $1,773 |
|
Core operating margin | 9.9 | % | | 9.1 | % |
Core earnings per share |
| $1.73 |
| |
| $1.40 |
|
| |
(1) | These measures exclude certain components of pension and postretirement benefit expense. See page 45 for important information about these non-GAAP measures and reconciliations to the most comparable GAAP measures. |
Revenues
The following table summarizes revenues:
|
| | | | | | | |
(Dollars in millions) | Three months ended March 31 |
| 2013 |
| | 2012 |
|
Commercial Airplanes |
| $10,690 |
| |
| $10,937 |
|
Defense, Space & Security | 8,110 |
| | 8,233 |
|
Boeing Capital | 105 |
| | 125 |
|
Other segment | 27 |
| | 24 |
|
Unallocated items and eliminations | (39 | ) | | 64 |
|
Total |
| $18,893 |
| |
| $19,383 |
|
Revenues for the three months ended March 31, 2013 decreased by $490 million or 3% compared with the same period in 2012. Commercial Airplanes revenues decreased by $247 million or 2% due to the suspension of 787 deliveries in January 2013 and lower commercial aviation services spares revenue partially offset by higher new airplane deliveries from other programs. Defense, Space & Security (BDS) revenues for the three months ended March 31, 2013 decreased by $123 million due to lower revenues in the Boeing Military Aircraft (BMA) and Global Service & Support (GS&S) segments, partially offset by higher revenues in the Network & Space Systems (N&SS) segment.
Earnings From Operations
The following table summarizes Earnings from operations:
|
| | | | | | | |
(Dollars in millions) | Three months ended March 31 |
| 2013 |
| | 2012 |
|
Commercial Airplanes |
| $1,219 |
| |
| $1,081 |
|
Defense, Space & Security | 832 |
| | 742 |
|
Boeing Capital | 44 |
| | 33 |
|
Other segment | (58 | ) | | (79 | ) |
Unallocated pension/postretirement expense | (339 | ) | | (208 | ) |
Other unallocated items and eliminations | (170 | ) | | (4 | ) |
Earnings from operations (GAAP) |
| $1,528 |
| |
| $1,565 |
|
Unallocated pension/postretirement expense | 339 |
| | 208 |
|
Core operating earnings (Non-GAAP) |
| $1,867 |
| |
| $1,773 |
|
Earnings from operations for the three months ended March 31, 2013 decreased by $37 million compared with the same period in 2012 primarily reflecting higher pension costs in 2013 and a benefit recorded in 2012 from a favorable court judgment that more than offset higher earnings at Commercial Airplanes and BDS.
Core operating earnings increased by $94 million compared with the same period in 2012 as higher earnings at Commercial Airplanes and BDS more than offset the 2012 benefit related to a favorable court judgment on satellite litigation.
For the three months ended March 31, 2013, Commercial Airplanes earnings increased by $138 million reflecting higher 737 and 777 airplane deliveries, and lower research and development expense partially offset by higher period costs driven by higher 787 engineering support costs related to the battery system and other costs associated with business growth. For the three months ended March 31, 2013, BDS earnings increased by $90 million compared with the same period in 2012 reflecting higher earnings in all three BDS segments.
Research and Development The following table summarizes our research and development expense:
|
| | | | | | | |
(Dollars in millions) | Three months ended March 31 |
| 2013 |
| | 2012 |
|
Commercial Airplanes |
| $419 |
| |
| $544 |
|
Defense, Space & Security | 272 |
| | 281 |
|
Other | 14 |
| | 10 |
|
Research and development expense, net |
| $705 |
| |
| $835 |
|
Our research and development expense for the three months ended March 31, 2013 decreased by $130 million compared with the same period in 2012 primarily due to lower spending at BCA on the 787 program partially offset by increased spending on the 737 program.
Unallocated Items and Eliminations The most significant items included in Unallocated items and eliminations are shown in the following table:
|
| | | | | | | |
(Dollars in millions) | Three months ended March 31 |
| 2013 |
| | 2012 |
|
Share-based plans |
| ($31 | ) | |
| ($22 | ) |
Deferred compensation | (56 | ) | | (36 | ) |
Eliminations and other | (83 | ) | | 54 |
|
Sub-total (included in core operating earnings*) | (170 | ) | | (4 | ) |
Pension | (358 | ) | | (189 | ) |
Postretirement | 19 |
| | (19 | ) |
Pension and Postretirement (excluded from core operating earnings*) | (339 | ) | | (208 | ) |
Total |
| ($509 | ) | |
| ($212 | ) |
* Core operating earnings is a Non-GAAP measure that excludes certain components of pension and postretirement benefit expense. See page 45.
Eliminations and other unallocated items for the three months ended March 31, 2013 increased by $137 million due to a $131 million benefit related to a favorable court judgment on satellite litigation in 2012.
We recorded net periodic benefit cost related to pensions and other postretirement benefits of $954 million for the three months ended March 31, 2013 and $843 million for the same period in 2012. The increase in net periodic benefit costs related to pensions is primarily due to higher amortization of actuarial losses driven by lower discount rates.
A portion of net periodic benefit cost is recognized as product costs in Earnings from operations in the period incurred and the remainder is included in inventory at the end of the reporting period and recorded in Earnings from operations in subsequent periods. Costs are allocated to the business segments as described in Note 17.
Net periodic benefit costs included in Earnings from operations were as follows:
|
| | | | | | | | | | | | | | | |
(Dollars in millions) | Pension | | Other Postretirement Benefits |
Three months ended March 31, | 2013 |
| | 2012 | |